London & Greater London · landlord licensing

Licensed, compliant and ready to let.

Chartered architects helping landlords navigate property licensing—from surveys and floor plans to fire safety, planning and the application itself.

97%

Planning approval rate

20+

Years’ experience

1 team

Architecture, structure & survey

Selective licensingAdditional HMOMandatory HMO

01 / Know the scheme

Which licence does your property need?

Under the Housing Act 2004, councils can run three kinds of property licensing. Each London borough sets its own schemes, areas, fees and conditions.

01

Mandatory HMO

Applies everywhere in England to HMOs with five or more people forming two or more households.

02

Additional HMO

Extends licensing to smaller HMOs, such as three or four sharers, in areas the council designates.

03

Selective

Covers homes let to a single household, a single tenant or two sharers, in designated areas. Croydon’s 2026 scheme, for example, covers 14 wards.

A licence is not planning permission

It gives no planning or building control approval and is not proof a property is free from hazards. Councils can still take enforcement action; conditions typically require the property, including new works, to meet planning and building regulations.

02 / Typical conditions

What councils commonly ask for

Conditions vary by borough and change over time. Check your council’s current scheme before letting.

  • Annual gas safety certificate
  • EICR at least every five years
  • Smoke alarm on every storey
  • CO alarm by fixed combustion appliances
  • Room uses and sizes on request
  • No overcrowding
  • Regular inspections with written records
  • Property kept free from serious hazards

03 / One coordinated team

Eight ways we help you get licence-ready.

Everything your licence calls for, from one RIBA Chartered Practice.

01

Measured survey & room schedule

Floor plans showing each room’s use and area, ready for your application and council requests.

02

Occupancy assessment

Maximum safe occupancy assessed against statutory space standards and HMO room sizes.

03

Condition & hazard survey

An HHSRS-based inspection with a prioritised list of defects to address before you apply.

04

Fire safety

Alarm and detection specification, plus fire risk assessments for multi-let properties.

05

Planning & building control

Regularising past extensions, loft rooms and conversions, including lawful development certificates.

06

HMO feasibility & Article 4

Conversion layouts, planning applications and HMO room standards for a change of use.

07

Licence application

We prepare and submit your application with the plans, certificates and declarations it needs.

08

Ongoing inspections

Scheduled inspections with written records, and reminders for certificate and licence renewals.

Gas safety certificates, EICRs and appliance testing are carried out by Gas Safe engineers and qualified electricians we coordinate for you.

04 / The route to licence

From first call to submission.

Six clear stages, with fixed fees agreed before each one starts.

Typical timeline

2–3 weeks

Survey to submission

Longer where remedial works, planning or building control approvals are needed.

  1. 01

    Free eligibility check

    Share the address and how it is let. We confirm which scheme applies, whether the property is exempt, and what the council will expect.

  2. 02

    Site survey

    One visit covers measurements, room uses, condition, fire safety and occupancy.

  3. 03

    Compliance report

    Receive floor plans, a room schedule and a clear list of requirements, with a fixed quote for each item.

  4. 04

    Works and approvals

    We design and manage remedial works, handle planning or building control, and arrange certificates through partner engineers.

  5. 05

    Licence application

    We assemble the evidence and submit your application. The council’s licence fee is separate from ours.

  6. 06

    Stay compliant

    Optional six-monthly inspections, written records and renewal reminders for the life of the licence.

05 / Transparent fees

Our fees, agreed up front.

Fixed fees confirmed in writing before we start. Prices are for a typical house or flat and exclude VAT.

Council fees are separate

Typically around £600–£1,000 per property for a selective licence, paid directly to the council. Check your borough’s current fee.

ServiceFee
Eligibility check
Free
Measured survey, floor plans & room schedule
from £395
Occupancy assessment
from £195
Condition & hazard (HHSRS) survey
from £450
Fire safety specification
from £295
Fire risk assessment (multi-let)
from £395
Planning or building control regularisation
from £950
HMO feasibility study
from £750
Licence application preparation
from £295
Six-monthly inspection & record
£125 per visit

Packages

A clear starting point.

Licence Essentials

Eligibility check, survey, floor plans, room schedule and application.

£795

Licence Complete

Essentials plus hazard survey, fire safety specification and works schedule.

£1,395

Portfolio Care

Six-monthly inspections, written records and renewal tracking.

£240/ property / year

Not included in our fees

Council licence fees; gas safety certificates, EICRs and appliance testing (arranged at cost through our partners); planning and building control application fees; and construction costs. Larger HMOs and multi-unit buildings are quoted individually.

06 / Common questions

Straight answers for landlords.

How long does a licence last?

Usually up to five years. Councils can grant a shorter term where they have compliance concerns.

My extension never had approval. Can I still apply?

Yes, but the licence will not protect you from enforcement. We can advise on regularising it first.

Does a property licence approve planning or building work?

No. A licence gives no planning or building control approval and is not proof that a property is free from hazards. Councils can still take enforcement action.

Are the fees shown the council’s licence fees?

No. Our service fees are separate from council fees. The guide notes council fees are typically around £600–£1,000 per property for a selective licence and are paid directly to the council.

How long does the process take?

The typical survey-to-submission timeline is 2–3 weeks. It can take longer where remedial works, planning or building control approvals are needed.

Who carries out gas and electrical testing?

Gas safety certificates, EICRs and appliance testing are carried out by Gas Safe engineers and qualified electricians we coordinate for you, at cost through our partners.

Why landlords choose Shorplans

Chartered practice. RIBA Chartered Practice and ARB-registered architects. ARB Reg No: 089055C.

One team. Architecture, structural engineering and surveying in-house, with a single point of contact.

London-wide. 97% planning approval rate and 20+ years’ experience across London and Greater London.

You stay in control. We act as your consultant. We don’t hold your licence or manage your property.

Start with a conversation

Book your free eligibility check.

Tell us the property address and how it is let. We’ll help establish which licensing scheme may apply.

71–75 Shelton Street, Covent Garden, London WC2H 9JQ

shorplans.com

This guide is general information, not legal advice. Licensing schemes, fees and conditions vary by borough and change over time. Requirements in one borough may differ from another; confirm the current rules, fees and conditions with the relevant council before letting or applying.