East London · Planning guide

Planning in Havering

Before submitting a project in Havering, check the right application documents, allow time for validation and confirm which permitted development rights apply to your address. This guide brings together council sources and a local example to help you prepare.

Sources last checked 2026-10-07

01

Before submission

Validation requirements

Havering Council provides specific checklists for different types of planning applications rather than a universal guide. Applicants must submit separate copies of documents with personal details and signatures removed.

  • Applicants must use specific checklists for various application types, such as Checklist 001 for householder applications.
  • Proposals involving a flat, maisonette, dropped kerb, or new dwelling require the full planning permission form.
  • Larger single-storey rear extensions (up to 6m for attached or 8m for detached properties) require specific prior approval applications.

SourceHavering — application requirements(opens in a new tab)· checked 2026-10-07

02

Timescales

Realistic decision times

Statutory target
The national determination period set in law, counted from validation. A target, not a guarantee.
Actual processing time
What the council's published performance data shows in practice, including extensions of time.

Allow for validation before the decision period starts. The usual statutory determination periods in England are 8 weeks for non-major applications, 13 weeks for major development and 16 weeks where environmental impact assessment is required, unless a different period is agreed.

  • These are statutory targets, not a measured borough average or a guarantee. No current borough-specific average has been verified for this guide.
  • An incomplete submission, amendments, committee referral or an agreed extension of time can extend the overall programme.
  • Ask the planning team about its current validation queue before setting a construction date. Prior approval and other specialist applications can have different statutory periods.

SourceGOV.UK — determining a planning application(opens in a new tab)· checked 2026-10-07

03

Permitted development

Article 4 restrictions

These are selected directions, not an exhaustive address search. Read the council’s current map, schedule, commencement date and any later modifications for your property. A conservation area is not automatically an Article 4 area, and a direction affecting changes of use does not necessarily restrict a home extension. Confirm the responsible planning authority too: some development-corporation areas have separate arrangements.

Havering has implemented Article 4 Directions to remove permitted development rights concerning the change of use from dwelling houses to houses in multiple occupation (HMOs).

  • Article 4 Direction Art4/1/2015 is in effect to regulate changes of use to HMOs.
  • Article 4 Direction Art4/2/2015 is also listed in relation to HMOs in Havering.

SourceHavering — Article 4 information(opens in a new tab)· checked 2026-10-07

04

Local examples

Public examples are drawn from council records to illustrate local policy and are not Shorplans projects or claims of planning approval. Examples labelled "Shorplans project" are from our own portfolio.

Shorplans project

Hornchurch new-build residence

Hornchurch

A bespoke 6-bedroom new build residence combining contemporary architecture with practical family living. The design features a generous open-plan kitchen, dining and living area, full-height sliding doors to the rear garden, and a dedicated cinema and games room at loft level. A refined mix of brickwork, render, and metal detailing creates a modern yet timeless appearance.

Lesson

Planning takeaway: use the design as a discussion point, not a planning precedent. The portfolio does not publish a planning reference or decision timescale for this project.