Working with Shorplans

Working with Builders: Tendering and Contracts

Prepare comparable tenders, choose a suitable contract and manage payments, variations and responsibilities during construction.

Reading
3 minutes
Reviewed

A contractor can price only the scope they understand. Coordinated information, a clear tender return and a suitable written contract reduce uncertainty, but do not remove the need for competent delivery and active decisions during construction.

01

Issue one clear tender package

Give tenderers the same drawings, specification, schedules and relevant survey information. Identify the proposed contract, programme assumptions, site access, occupied areas and working restrictions.

State the treatment of kitchens, bathrooms, finishes, external works, statutory fees and specialist designs. Ask for exclusions, provisional sums and assumptions to be listed explicitly rather than hidden in a covering email.

02

Compare scope before price

Check that each tender covers the same work, includes VAT where applicable and has realistic allowances. Discuss large differences in structural work, glazing, preliminaries and completion time before deciding that one builder is cheaper.

Review relevant references, insurance, competence, capacity and who will supervise day to day. A past project photograph is not evidence of current staffing or financial capacity.

03

Choose a suitable written contract

The appropriate form depends on the scope, procurement and whether a contract administrator is appointed. Seek professional advice on payment terms, variations, time, insurance, defects and dispute provisions before signing.

Define the contractor's design responsibilities and how they interface with the architect and engineer. Do not assume the designer is administering the building contract unless that service is included in the appointment.

04

Control changes and payments

Record proposed changes, their cost and programme effect, and the required design or consent review before instructing them. Verbal site decisions can create disagreement about what was authorised.

Use the agreed payment mechanism and relate payments to the contract, not just a request for funds. Keep a record of certificates or valuations where applicable and understand the basis for deposits, retention and final payment.

05

Plan safe construction and handover

Identify CDM and building-regulations dutyholders and allocate temporary works, inspection booking, protection and site safety responsibilities. Occupied-home arrangements need particular attention to dust, access, services and escape.

Before completion, agree snagging, commissioning, certificates, warranties, final drawings and outstanding work. A building control completion certificate and contractual practical completion are different records; collect the documentation appropriate to each.

Checklist

Points to confirm before you commit time or money.

  1. Tender one coordinated scope and require explicit exclusions.
  2. Review references, insurance, supervision and realistic allowances.
  3. Agree a suitable contract and design responsibilities.
  4. Record changes, follow payment terms and plan evidence-led handover.

From our projects

Real Shorplans work, and why it is relevant here.

Basement & Extension Scheme

Fulham, London

Basement & Extension Scheme

Why it is relevant: The Fulham basement-and-rear scheme includes piling and specialist waterproofing. It is a relevant reminder to allocate specialist interfaces in the tender rather than leave them in an undefined provisional sum.

A bold yet sensitive intervention pairing a new basement level (cinema room and sauna wellness suite) with a refined rear extension for a six-bedroom semi-detached in Fulham SW6. Full-height glazing dissolves the boundary between kitchen, dining, and garden. Structural engineering via contiguous piling and Type C cavity drain waterproofing system.

View related projects
Single Storey Side & Rear Extension

Kenley, Surrey

Single Storey Side & Rear Extension

Why it is relevant: The Kenley side-and-rear extension provides a more conventional domestic comparison. The portfolio does not publish either project's building contract, contractor price or contract-administration appointment.

A carefully considered single-storey extension combining both side and rear additions to transform the ground floor into a generous, light-filled family living space. Materials chosen to complement the existing property while introducing a clean contemporary character with bi-fold doors, roof lanterns, and seamless indoor-outdoor connection.

View related projects

Official sources

  1. 1.HSE — domestic clients and construction duties (opens in a new tab)
  2. 2.RIBA — working with an architect (opens in a new tab)
  3. 3.GOV.UK — how to apply for building regulations approval (opens in a new tab)

General guidance for England, with a London focus. Requirements depend on the property, proposal and current rules. This is not a site-specific design, legal opinion, fixed quotation or guarantee of approval. Check the linked official guidance and obtain project-specific professional advice before acting. Last reviewed .